
Menifee · Riverside County · 12.88 kW solar · Tesla Powerwall 3 + 1 expansion unit
Solar + Powerwall 3 Expansion in Menifee
A completed Menifee solar-and-storage project with 28 REC 460AA Pure-RX modules (12.88 kW), a Tesla Powerwall 3 with one DC expansion unit, and SCE Permission to Operate.
12.88 kW · 28 REC 460W
Solar array
Powerwall 3 + 1 expansion
Storage
SCE PTO · May 18, 2026
Utility approval
The completed Menifee project
OC Solar's completed-project record identifies this as a residential solar-and-battery installation in Menifee. The verified equipment record lists a 12.88 kW array of 28 REC 460AA Pure-RX modules paired with a Tesla Powerwall 3 and one Tesla Powerwall 3 DC expansion unit on Southern California Edison service.
The installation was completed on April 29, 2026, under City of Menifee permitting and received SCE Permission to Operate on May 18, 2026. Customer name, street address, financial information, and production estimates are intentionally excluded.
Heat-tolerant REC HJT panels + expanded storage
Menifee's inland summers drive heavy afternoon and evening air-conditioning loads during SCE's 4–9 PM peak period. Combining low-temperature-coefficient REC Alpha Pure-RX modules with expanded Powerwall 3 storage allows the home to bank midday solar generation for evening use and configured backup loads.
More OC Solar projects
Representative of OC Solar's 6,373 Southern California projects & service calls. System size, equipment, and timelines vary by home; figures shown are project specifications, not guaranteed savings.
Ready to take control of your power bill?
Design it yourself and see modeled pricing online—no sales call required. Eligible Southern California addresses can also book a free site audit. Prefer help? Our local team is available.
Already a customer? Refer a friend & get $500 · See all OC Solar reviews
Licensed, Bonded & Insured · CSLB #1023627