Corona · Riverside County · 28 Qcells 430W modules · 2 Tesla Powerwall 3 units
Solar + Dual Powerwall 3 in Corona
A completed Corona solar-and-storage project with 28 Qcells 430W modules, two Tesla Powerwall 3 units, and SCE Permission to Operate.
28 Qcells 430W
Solar modules
2 Tesla Powerwall 3 units
Storage
SCE PTO · May 24, 2025
Utility approval
The completed SCE project
OC Solar's completed-project record identifies this as a residential solar-and-battery installation in Corona. The equipment record lists 28 Qcells 430W modules, two Tesla Powerwall 3 units, and a Backup Switch on Southern California Edison service.
The installation was completed on December 9, 2024, and the project received SCE Permission to Operate on May 24, 2025. Customer name, street address, financial information, savings, and production estimates are intentionally excluded.
Solar generation with two-battery storage
Two Powerwall 3 units provide more stored energy and discharge capability than a single unit. That can support a larger configured backup plan or shift more available solar energy into later household use, although actual performance depends on consumption, reserve settings, system configuration, and the home's SCE rate plan.
Representative of OC Solar's 6,373 Southern California projects & service calls. System size, equipment, and timelines vary by home; figures shown are project specifications, not guaranteed savings.
Ready to take control of your power bill?
Get a fast, honest, no-pressure estimate from a real local advisor — built from your actual roof and usage.
Already a customer? Refer a friend & get $500 · See all OC Solar reviews
Licensed, Bonded & Insured · CSLB #1023627