
Fresno · Fresno County · 42 Qcells 430W modules · 2 Tesla Powerwall 3 units
Solar + Dual Powerwall 3 in Fresno
A completed Fresno solar-and-storage project with 42 Qcells 430W modules, two Tesla Powerwall 3 units, and PG&E Permission to Operate.
42 Qcells 430W
Solar modules
2 Tesla Powerwall 3 units
Storage
PG&E PTO · Jul. 8, 2025
Utility approval
The completed PG&E project
OC Solar's completed-project record identifies this as a residential solar-and-battery installation in Fresno. The equipment record lists 42 Qcells 430W modules, two Tesla Powerwall 3 units, and a Backup Switch on Pacific Gas and Electric service.
The installation was completed on May 14, 2025, and the project received PG&E Permission to Operate on July 8, 2025. Customer name, street address, financial information, savings, and production estimates are intentionally excluded.
A larger solar-and-storage configuration
The 42-module array gives this project a larger generation footprint, while two Powerwall 3 units provide storage for later household use and configured backup loads. Actual performance depends on roof production, household consumption, reserve settings, weather, and the home's PG&E rate plan.
More OC Solar projects
Representative of OC Solar's 6,373 Southern California projects & service calls. System size, equipment, and timelines vary by home; figures shown are project specifications, not guaranteed savings.
Ready to take control of your power bill?
Design it yourself and see modeled pricing online—no sales call required. Eligible Southern California addresses can also book a free site audit. Prefer help? Our local team is available.
Already a customer? Refer a friend & get $500 · See all OC Solar reviews
Licensed, Bonded & Insured · CSLB #1023627